Rafa Nadal Academy

Project scope

Executive and Project Management
Engineering Design & Technical Supervision
Installation execution management
Smart Operations Management (TALAT Smart Hotel)

Year

2013-2023

Location

Manacor, Mallorca (Spain)
Rafa Nadal Academy

Talat was commissioned to develop this area of 17,000 m2 that makes up the Rafa Nadal Academy. In this way, the complex comprises residence, training school, hotel, tracks, sports, changing rooms, bar as well as park areas.

TALAT was chosen for full management, executive direction, engineering project, management of plant execution, project management (project, construction and execution coordination, contracting, budgetary and economic control) as well as complex management using our Software.

The extension was subsequently requested for administrative and sports use, with us in charge of the engineering project and construction management of the facilities, material execution management and coordination of safety and health of the planned works.

TALAT’s solution integrates advanced energy systems and intelligent control, featuring:

Electrical and Energy Infrastructure
Full electrical network design
1,750 photovoltaic panels for clean electricity
Power distribution with harmonic filters and capacitors

Heating, Cooling & Hot Water Systems
Centralized HVAC system across buildings
2,000 kW thermal energy production
Chillers with energy recovery
400 kW biomass boilers
Water-condensed heat pump for DHW

Smart Control and Monitoring
156 programmable automation devices
Building Management System (BMS)
8,500 monitoring signals
Zonal energy control and adaptive lighting

Urban Services and Utilities
Gas network extension
Replacement of potable water pipes

Project Coordination
Technical and construction management
Safety coordination and project management

Rafa Nadal Academy
Rafa Nadal Academy

TALAT’s solution integrates advanced energy systems and intelligent control, featuring:

Electrical and Energy Infrastructure
Full electrical network design
1,750 photovoltaic panels for clean electricity
Power distribution with harmonic filters and capacitors

Heating, Cooling & Hot Water Systems
Centralized HVAC system across buildings
2,000 kW thermal energy production
Chillers with energy recovery
400 kW biomass boilers
Water-condensed heat pump for DHW

Smart Control and Monitoring
156 programmable automation devices
Building Management System (BMS)
8,500 monitoring signals
Zonal energy control and adaptive lighting

Urban Services and Utilities
Gas network extension
Replacement of potable water pipes

Project Coordination
Technical and construction management
Safety coordination and project management

The Rafa Nadal Academy was built in two phases. Phase 1 covered 24,000 m², including 17,000 m² for residence, academy, hotel, courts, and facilities. Phase 2 expanded it to 41,000 m².

TALAT managed both phases, handling engineering design, construction oversight, material execution, and safety coordination, while deploying Talat Smart Hotel Software for energy and maintenance management per ISO 14001 and 50001 standards.

  • DEKTON Installed 82,296 m²
  • Earth volume excavated (Phase 1) 79,568 m³
  • Structural concrete used 16,439 m²
  • Structural steel used  1,750 t

Facilities

Tennis courts
Other sports courts (padel, squash, beach volley football…)
Swimming pools
Fitness and Wellness centre
Residence
Dining
Educational Facilities (Academy)
Sports medicine facility
Museum

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.