Motorworld

Project scope

Integrated Facilities
Air Conditioning
DHW and Electricity
BIM Engineering and Designfor Machine Rooms
KNX Protocol Control and Integration

Year

2024

Location

Palma de Mallorca (Spain)
Motorworld

We carried out the climate, comfort, hot water, sanitation, and electrical network project that supplies an entire 12,000 m² complex. Our engineering and BIM teams worked closely together on the redesign of the machine room. Meanwhile, the Control team worked on an open integration of devices with KNX protocol using the EcoStruxure Building Operation platform from manufacturer Schneider Electric.